CLC mixed up our shipment a little bit and sent us two boxes with molds and left out the box with the floor pieces. They were quick to ship out the missing box, so no problems there, but now I have an extra unused building mold.
Anybody looking to do a scratch build and want a new mold for 100 bucks less?