Reply To: Teardrop build from plans

#1474
faithie999
Participant

in the “normal” build, once two abutting panels are installed in the mold, you apply a strip of 3″ fiberglass tape then epoxy, to hold the panels together until the “big” fiberglassing job is completed on the outside. ¬†what are you planning on doing to hold the cedar strips together? ¬†narrower strips of fiberglass at each joint, or waiting until all the cedar strips are installed and stitched together, then use a wider sheet of fiberglass?