Reply To: Teardrop build from plans

#1474
faithie999
Participant

in the “normal” build, once two abutting panels are installed in the mold, you apply a strip of 3″ fiberglass tape then epoxy, to hold the panels together until the “big” fiberglassing job is completed on the outside.  what are you planning on doing to hold the cedar strips together?  narrower strips of fiberglass at each joint, or waiting until all the cedar strips are installed and stitched together, then use a wider sheet of fiberglass?